Introduction

The Budhil Hydro Electric Project (BHEP) is a run-of-the river hydro project on the Budhil stream, a major tributary of the Ravi River, in the Chamba district of the state of Himachal Pradesh in India. The project having an installed capacity of 70MW has been in operation since May 2012. The project after being acquired from Lanco group is being referred as Greenko Budhil Hydro Power Private Limited.